The feasibility study was launched in the Summer of 2025. The results guided the official campaign timeline and scope, with the campaign starting in November 2025 and running through the end of 2028.

The feasibility study was launched in the Summer of 2025. The results guided the official campaign timeline and scope, with the campaign starting in November 2025 and running through the end of 2028.